What a review is for

A design review exists to find expensive problems while they are still cheap to fix. A flaw found on paper costs an hour; the same flaw found after launch can cost a quarter. Reviews also spread knowledge: every review teaches the attendees something about a part of the system they do not own. They are not for approving taste, rewriting the design in the reviewer's preferred style or demonstrating seniority. A good review leaves the author with a shorter list of risks and the attendees with a better mental model of the system.

A review format that works

Distribute the doc at least two working days ahead and expect comments in the doc before the meeting. Then use the meeting only for what comments cannot resolve. Many teams start with ten minutes of silent reading so everyone is on the same page.

  • Author restates the problem and the decisions needing input (5 minutes)
  • Walk the top risk scenarios through the design, not the happy path
  • Capture each concern as: issue, severity (blocking or non-blocking), owner
  • End with a clear outcome: approved, approved with changes, or needs another round
  • Keep the meeting to 45-60 minutes and the attendee list under eight

A reviewer's checklist

Good reviewers ask the questions the author was too close to ask. Bring a consistent checklist so reviews are fair and predictable rather than dependent on who shows up.

  • What happens when each dependency is slow or down?
  • Where is the single point of failure? What is the blast radius?
  • How does this behave at 10x the stated load?
  • Who can read and change this data? What is logged?
  • How is it deployed, rolled back and migrated?
  • What will it cost per month, and how does cost scale?

Avoiding the classic failure modes

Bikeshedding (Parkinson's law of triviality) pulls discussion towards whatever is easiest to have an opinion on, such as naming. Redirect it to the parking lot. Gatekeeping happens when one senior voice blocks without explaining what would change their mind; require every blocking comment to state the condition for removal. Finally, keep a review log of outcomes, so you can see which reviews actually caught problems and tune the process. Time-box each topic, and if two experts disagree, record both positions and let the design owner decide, escalating only for one-way doors.

Key takeaways

  • Reviews exist to find expensive problems cheaply and to spread knowledge, not to approve taste.
  • Send the doc early, collect comments asynchronously, and use the meeting for unresolved risks.
  • Use a consistent checklist: failure, blast radius, 10x load, data access, rollout, cost.
  • Every blocking comment must state what would resolve it.

Sign in to track lessons and earn badges.

Writing design docs and RFCsC4 and diagramming for audiences

Coming up

Course: 0/32 lessons · 0/10 challenges0%

Build it on the canvas, pass the review (70+) and mark it complete to count it toward the course badge.

  1. 1/10Design a Polls and Voting AppTurn a loose brief into measurable requirements and a back-of-envelope estimate, then defend a simple design that enforces one vote per user.Easy
  2. 2/10Design a Link Preview Service
Threat-model a service that fetches untrusted URLs and design its SSRF defences across the trust boundary.
Easy
All 10 challenges →